+38 (0372) 563-980

fax: +38 (0372) 563-970

Ukraine, Chernivtsi,

Ya. Mudroho str., 35

+38 (‎‎095) 27-63-970

From Monday to Friday: 09:00 - 16:45

Saturday - Sunday: ................ Day off

Лого

ChernivtsiKhimichniy Zavod

Soluble acrylic paint universal nacreous

VC.

Available

on order UAH

Buy

Fast delivery

High-quality products

Volume:

0,25 kg

Colour:

Product description
Characteristic
Video
Documents

Application 

It is intended for decorative finish and protection of metal, wood, gypsum, concrete, polystyrene products from atmospheric influence both inside and outside.

ADVANTAGES

It resists extremely atmospheric influences, moisture, corrosion, ultraviolet radiation.

Surface preparation 

Before surface painting, it should be cleaned up from dust and dirt. Metal surfaces should be grounded beforehand with the primer “GF-021” or enamel rust converter EPF – 103. Porous surfaces of wood, gypsum are grounded with water-soluble acrylic primer.

Paint preparation 

Paint should be stirred and if it is necessary to dilute it with water.

Application methods

The paint should be applied with a foam rubber sponge, a brush or a roller in 1-2 layers. The drying time of the layer at (20 ± 2) °C is not more than 2 hours. The optimal temperature regime of applying is not less than +10 ° C. Paint consumption ranges from 80 g/m2 to 120 g/m2, depending on the condition of the surface.

Guarantee storage life ня

12 months from the production date

The paint is applied witha foam rubber sponge, a brush or a roller in 1-2 layers
Drying time of one layer at temperature (20±2) °Сnot more than 2 h
Application temperaturefrom +10 °C
Paint consumptionfrom 80 g/m2 to 120 g/m2
Product description

Application 

It is intended for decorative finish and protection of metal, wood, gypsum, concrete, polystyrene products from atmospheric influence both inside and outside.

ADVANTAGES

It resists extremely atmospheric influences, moisture, corrosion, ultraviolet radiation.

Surface preparation 

Before surface painting, it should be cleaned up from dust and dirt. Metal surfaces should be grounded beforehand with the primer “GF-021” or enamel rust converter EPF – 103. Porous surfaces of wood, gypsum are grounded with water-soluble acrylic primer.

Paint preparation 

Paint should be stirred and if it is necessary to dilute it with water.

Application methods

The paint should be applied with a foam rubber sponge, a brush or a roller in 1-2 layers. The drying time of the layer at (20 ± 2) °C is not more than 2 hours. The optimal temperature regime of applying is not less than +10 ° C. Paint consumption ranges from 80 g/m2 to 120 g/m2, depending on the condition of the surface.

Guarantee storage life ня

12 months from the production date

Characteristic
The paint is applied witha foam rubber sponge, a brush or a roller in 1-2 layers
Drying time of one layer at temperature (20±2) °Сnot more than 2 h
Application temperaturefrom +10 °C
Paint consumptionfrom 80 g/m2 to 120 g/m2
Video
Documents

0

Your basket empty

Please make your first purchase

Place an order